The Elmore City facility is one of the largest of Forum’s manufacturing plants, with close to 100 employees.

The facility, in existence since 2002, saw a major expansion in 2011, with the construction of a 24,000 square feet state of the art facility, whose flow of fabrication is based on lean principles (build more, bigger and faster). Overall, the Elmore City facility consists of a 48,000 square feet manufacturing plant; complete stress relieving sandblasting and painting capabilities as well as a unique automated manufacturing process.

Facility Highlights Include:

  • 3- 25 Ton Bridge Over Head Cranes with 35’ hook height
  • 1- 15 Ton Bridge Over Head Crane
  • 2- 10 Ton Over Head Crane
  • 6- 5 Ton Over Head Crane
  • 26- 2 Ton Jib Cranes
  • Sub-Arc Welding
  • CNC Plasma Pattern Cutter
  • CNC Pipe Plasma Cutter
  • ASME U and R Stamp
  • Stand-alone paint and coating booth
  • Stand-alone blasting booth
  • Ability to manufacture pressure vessels up to a weight capacity of 100,000 lbs
  • On-site stress relieving