Quality

Quality Management System-ISO 9001:2008

OJS has established the following quality policy:

“Provide customer satisfaction with the highest quality products and services through continual improvement of our ISO 9001:2008 program”

OJS consider their customer satisfaction measurement to be extremely stringent and productive. To obtain this measurement our focus on quality control is divided into three main areas:

Contract Review

The contract review process is the foundation for planning and execution of all project requirements, therefore due diligence in review of customer HSEQ requirements, specifications, drawings etc is paramount.

Provision of Services

This quality control process is the most intricate of the three covering OJS activities from the logistics of mobilizing consumables, equipment and personnel to a project to the demobilization after the pipe is laid. It encompasses procedures, Inspection and Test Plans, production monitoring, material traceability from manufacturer to field joint, equipment performance, personnel performance and overall customer satisfaction.

Provision of Products

On award of contract, all purchases are recorded and the items inspected on delivery before logistics ships the goods to the project mobilization destination. Vendors are continuously monitored to ensure the quality of their products and a non-conformance is issued should the quantity or quality be different to the PO and specifications. Conformance batch certificates for all products are controlled and issued to the customer by purchasing.

Some of the key HSEQ benefits our products provide are:

  • Sea Sleeve which replaces sheet metal molds and banding used for HDPF infill at the field joints on concrete weight coated pipelines. This eliminates the risks of cuts and eye injuries common with the sheet metal molds. As Sea sleeve is a polyethylene based product it will not snag with fishing nets wee sheet metal molds has proven to be problematic. Similarly with ROV umbilicals and divers in shallow waters.
  • Fully enclosed blast recovery systems provide a very clean and safe environment for OJS and our Clients personnel on site compared to the open blasting systems.
  • FBE powder recovery system removes over 90% of the powder in the atmosphere surrounding the equipment during the FBE powder application. See OJS video on the home page of this application offshore.
  • Mercury free Densiflex Solid polyurethane complies with recent USA legislation regarding mercury content for facilities being installed offshore.

Densiflex®, Sea Sleeve®, and Deep Sea Sleeve® are registered trademarks of Offshore Joint Services, Inc.